1 x G-36SL Guascor Energy Biogas Engine Commissioning in Kapilit Palm Oil Mill
This is the second unit Guascor Energy genset, G-36SL model providing 610 kWe and is also a soundproof generator in container. This supply completes the installation and commissioning at Kapilit Palm Oil Mill.
In 2014, this mill was equipped with one first Guascor Energy soundproof containerized G-56SM biogas 1 MWe genset, to fulfill the energy needs of the plant by using the biogas produced and the estate housing area.
Over time, the company saw that their power generation needs, far from being satisfied, began to increase and thought about expanding the power generation plant.
Thanks to the power reliability and good experience they had with the results provided by the first Guascor Energy power generation unit, (56.000 running hours to date) the company decided to acquire a second unit, which has been recently delivered and is already up and running.